Homerogz-utility-reflective-stitching-long-lead
Introduction:
The Rogz Utility Reflective Stitching Long Dog Leash is designed for dog owners who prioritize safety, durability, and convenience. Combining high-quality materials with thoughtful features, this leash ensures both you and your furry friend enjoy every walk, day or night.
Product Features:
- High Durability: Built with long-lasting components for reliable use over time.
- Reflective Stitching: Woven reflective yarn enhances nighttime visibility for safer walks.
- Safety: Prevents your dog from straying, keeping them secure at all times.
- Waste Bag Holder: Includes an accessory to conveniently carry your waste bags.
- Improved Control: Designed to help you halt your dog effectively and maintain better control.
Technical Specifications:
- Type: Dog Leash
- Material: High-strength webbing with reflective yarn.
- Length: Long design for added flexibility and control.
- Compatibility: Suitable for all dog sizes.
- Additional Accessory: Built-in waste bag holder for added convenience.
Utility Classic Lead Size Guide:
Size |
Webbing Width |
Adjustability |
||
mm |
in |
m |
ft |
|
S |
11 |
3/8 |
1.8 |
6 |
M |
16 |
5/8 |
1.4 |
4.6 |
L |
20 |
3/4 |
1.4 |
4.6 |
XL |
25 |
1 |
1.2 |
4 |
XXL |
40 |
1 5/8 |
0.5 |
1.5 |