Kibbles Logo
Homerogz-pop-art-long-lead

By Rogz

SKU : 301587

Product Description

JellyBean
HL01
SMALL
Yorkie, Pom, Maltese, Miniature Poodle, Chihuahua

Scooter
HL+HLL12
MEDIUM
Pug, Scotty, Jack Russel, Maltese Poodle, Terrier

Beach Bum
HL+HLL03
LARGE
Dalmation, Spaniel, Doberman, Boxer

Armed Response
HL+HLL02
X-LARGE
Rottweiler, Bouvier, Ridgeback, Labrador

Special Agent
HL04
XX-LARGE
German Shephard, Bulldog, Bouvier, St. Bernard
cool-graphix  Cool Graphix
A wide range of cool graphic ribbons are stitched onto high grade webbing, ensuring your dog sports the latest and greatest.
die-cast-ring  Die-cast ring
Custom designed die cast ring (no welding). Electroplated chrome for a tarnish free finish.
SPECIFICATIONS
Acetyl Plastic Components, Zinc DieCast Components, Reflective Stitching, Nylon Webbing

Dimensions

Size Width of Webbing Length
JellyBean SMALL 1.1 cm | 3/8" 1.8m | 71"
Scooter MEDIUM 1.6 cm | 5/8" 1.8m | 71"
Beach Bum LARGE 2 cm | 3/4" 1.8m | 71"
Armed Response X-LARGE 2.5 cm | 1" 1.8m | 71"
Special Agent XX-LARGE 4 cm | 1 5/8" 0,5m I 20"